RBC understands that the process of planning and
building a remodeling project can be a daunting undertaking,
filled with many choices, possibilities, and decisions. Our
process helps guide you down a clear, orderly path
through the design and construction of your project.
We
do this as your partner ensuring complete trust,
peace
of mind, and total satisfaction.
The Four Phases of
Design |
| |
 |
| 1 |
Feasibility - What WILL make your
great home better? We will lead you in a
discussion to help you establish four main
design considerations for your project, and
ask about:
- Your needs (Baby’s
coming and we don’t have an extra bedroom)
- Your wants (I
don’t
really NEED this but would really like to
have that Jacuzzi whirlpool)
- Existing site considerations (Exploring
the structure and existing features of
your home)
- Your budget (Only you
know what you can comfortably afford) |
|
 |
| 2 |
Schematic Development - After establishing
the project’s design potential and
budget range, we then focus on design. Right
now, “Design
Matters”, and we take care to check all
the following:
- Review existing site
conditions and take
measurements (Noting structural and mechanical
conditions. Many digital pictures
will be taken to refer to back at the office)
- Review zoning and
building codes (Each
state, county, & locals have their
specific codes to follow)
- Provide preliminary
design sketches (How
the design will fit together and appear
in relation and proportion to the rest
of your house)
- Projecting construction
costs to within +/-10% of budget at this stage |
|
 |
 |
 |
| 3 |
Design Development – Once the
preliminary design and budget are approved
we are ready to develop the details.
- Refining the preliminary
design ideas
into a final design (ex. Layout of kitchen)
- Selecting major products and building
materials (granite tops, cabinets, flooring
material, etc.)
- Approving layouts for electrical, plumbing,
and mechanical (exact location of
lighting fixtures)
- Projecting construction
costs for final
budget number |
|
 |
| 4 |
Construction Documents – At this
phase, we are ready to build. All major
decisions have been made, and we can proceed
into the preparation of the following construction
documents.
- Working drawings are
completed
- Project specifications are finalized
- Contract agreement
with fixed price plus any allowances for
selections not yet made. |
|
 |
|
At this point in the
process, you, the homeowner, are fully
informed and prepared for this project. All
of the details have been worked out and
all the expectations are understood. We've not yet begun
construction, but know exactly what will
happen from this day forward. |
|
|
The
Four Phases of Building |
| |
 |
| 1 |
Building Permits – We handle applying
for all building permits and zoning issues
for the customer with the local governing
departments pertaining to your project. |
|
 |
| 2 |
Pre-Construction
Conference – Our
passing of the baton between our design
team to our construction team meeting at
the project site to make all parties aware
of all the final details. |
|
 |
 |
 |
| 3 |
Construction now begins with RBC’s
Leadman in charge of your project. On
larger projects, periodic meetings will take
place with you and RBC’s production
manager to maintain satisfaction at each
step of your project and total understanding
of the construction process. |
|
 |
| 4 |
Final Walk-Thru – At 99.9% or
substantial completion, we will walk through
the entire project and continue our check
of total satisfaction and quality workmanship. A
punch list of outstanding tasks are listed
and completed by our production team. After
final payment is received, a lien waiver
will be issued verifying contractor payment
for all monies spent on your project. Customer
evaluation surveys are mailed for feedback. |
|
 |
Your satisfaction with
the project is guaranteed! |
|
|
|
 |
 |
Rob Boram Construction, Inc
#WV000180
536 Charles Street, Wellsburg, WV 26070
Toll Free 1-877-762-6726
Privacy Policy |
 |
 |
|
|
 |
|